Design Concept #2 - (Wilson lake as holding pond)
Create an artificial recirculating whitewater course
that uses Wilson lake as its holding pond. This method would prevent
having to create a seperate holding pond on the site. The water would
simply be pumped from below the "low pool" lake level, and up x number of
feet to the start pool of the course. Then the water would flow down
the artificial channel and empty back into Wilson lake, with a conveyor belt
taking boaters back to the small start pool. Location of such course
would have to be carefully considered given the high elevation of Veterans
park and its tortoise shell like shape.